Used GE 9FA Combined Cycle Power Plant for Sale, 388 MW, 50 Hz

2006 · 36,000 hours · preserved for relocation
On site1 image

A 388 MW combined cycle plant built around a GE 9FA gas turbine (233 MW) and an Alstom steam turbine (156 MW), with triple-pressure steam generation, supplementary duct firing, and dry low NOx emissions control. The plant is idle and maintained under GE-standard preservation, ready for relocation.

OEMGE (gas turbine) · Alstom (steam turbine)
Model9FA
Equipment typeCombined cycle power plant
Quantity1 plant
Rating388.5 MW at site conditions · 233 MW gas turbine · 156 MW steam turbine
Frequency50 Hz
Year2006
Operating hours36,000
FuelNatural gas
Configuration1x1 combined cycle · triple-pressure HRSG · supplementary duct firing · dry low NOx
ConditionUsed · idle, preserved to GE standard
StatusAvailable
Status · Available · Specifications, records, and pricing shared directly · [email protected]